Szigetcsép 400/120 kV transformer substation, architectural work

Start: September 2016
Completion deadline:  December 2017
Type of work:  Road construction, utility construction, complete construction of buildings

Technical summary of the content of the project: foundations for the transformers, firefighting water reservoir, foundations for equipment and portals on site, cable conduits and fence construction, and roads for the transportation of transformers and other equipment, and constructions of buildings required for operation.

 

A-HÍD Zrt. is performing architectural work on the planned 400/120 kV transformer substation on the outskirts of Szigetcsép as a subcontractor of MVM OVIT Zrt.

The task of A-HÍD consists of four main parts, the excavation work for the preparation and landscaping of the site, underground and overground construction, and control structures, and construction of the substation’s network of concreted roads.