RENOVATION OF THE TISZA BRIDGE OF QUEEN ELIZABETH AT TOKAJ

 

Beginning of work: 28.06.2018.
Deadline for completion: 31.05.2020.
Type of work: bridge reconstruction

 

Few sentences about the project:

Our task is to widen the bridge on one side by a bicycle path, on the other side by creating at least 3 tracks wide footpaths with the necessary bridge head extensions, while ensuring the unchanged load capacity “A”. In addition, complete renovation of the bridge (construction of insulation, replacement of cladding, rebuilding of edges, replacement of sinks, replacement of sectional steel railings, construction of guides with appropriate retention levels, dilatation replacement, corrosion protection, navigation lights, repair of substructures, rebuilding of gas and drinking water pipelines). Cycling and pedestrian crossing on Rakamaz side of the road. Transformation of the Tokaj roundabout into a viable mid-island, complete renovation, replacement of affected utilities, and their protection.