Start of work: | 27.01.2020. |
Finish of work: | 31.07.2022. |
Type of work: | bridge construction |
A few sentences about the project:
By the order of of the investor NIF Zrt. (National Developer of Infrasructure) , the A-Híd Zrt. continue the reconstruction of the Farmos Hajta brook railway bridge on the Budapest – Újszász – Szolnok railway. The aim of the investment is to eliminate the narrow permeability in the railway network.
Our task is to rebuild the 12.0m free-opening, bed-through reinforced concrete trough – bridge into a 12.0 m free-opening reinforced concrete slab bridge, with the demolition of the old railway bridge structure and the construction of a new bridge structure, with the reconstruction of the related railway superstructure.
Reconstruction work will be carried out in two phases, with continuous traffic on one track.