PERFORMANCE OF THE DEVELOPMENT TASKS OF WASTEWATER TREATMENT PLANT AND SEWERAGE NETWORK OF SOLT

 

Beginning of work: May 2019.
Deadline for completion: 1095 days
Type of work: Solt development of the waste water treatment plant of Solt

 

Few sentences about the project:

The purpose of the investment is to develop an existing wastewater treatment plant which receives wastewater of Solt and Dunatetételes, and the supply of purified sewage in the middle of the river Danube. The plant is designed with a capacity of 11250 inhabitant unit, 920 m3 / d. During the construction phase, the old technology will continue to ensure that the incoming wastewater is cleaned.

The Solt II. and V. public wastewater pumping stations are being renovated  togwether with the complete mechanical refurbishment of lifting shafts, acid-proof lining, and electrical and control engineering reconstruction.