M35 HIGHWAY II. CONSTRUCTION OF TECHNICAL OBJECTS.

Start of work  11.10.2016.
Completion deadline  10/12/2018
Type of work: construction of bridges for higway

Within the framework of the project, we have constructed 11 multi-bearing beam bridges, including 1 overpass and a combined game passage over the Kösely Main Canal,

Construction of 2 game passage  at both ends of the section, construction of 8 underpasses (5 dirt road crossings, 3 road crossings).

For all bridges, besides structural construction, we have carried out load-bearing as well as pre- and backfill construction, piling test loads, sinking measurements (pipe-laying, measuring, demolition), slope-, bed- and ditch- coverings, stairs and  drainage of road water constructions,

In the case of passage for wild living, our task also was to carry out the corresponding planting and gardening work by building rows of logs at the edges of the bridge and placing stone blocks before and after the bridge.

Another task was to enclose the channel cover of the main channel of Kesely under the flyover B569.

(The project also included the construction and demolition of temporary transit lanes under project No. A1134.)