Start of work: | 05.2019. |
Completiondeadline: | 03.04.2020. |
Type of work: | construction of closed and open stormwater drainage system, reconstruction of existing stormwater drainage system |
A few sentences about the project:
In the case of a closed system: Demolition, trench excavation, rainwater drainage, manhole and sink construction, earth backfilling, pavement restoration
In case of open system: Trench training, trench cleaning, trench cladding with slabs, grassing of slopes, bench arrangement.