DEVELOPMENT, DESIGN AND IMPLEMENTATION OF WASTEWATER TREATMENT PLANT AND SEWERAGE NETWORK OF MEZŐHEGYES

Design: Reconstruction of sewerage network and preparation of licensing, construction and realization plans for drinking water pipeline and wastewater treatment plant

Construction:

Reconstruction of sewerage network of ~ 400 m from D300 stoneware pipe

At a waste water treatment plant: – Construction of a new biological structure (8281 inhabitant unit according to sewage load and taking into account the quantities discharged from the sewerage system of previous years)

  • Construction of a new technological machine room
  • Construction of a new treatment facility
  • Construction of a new covered car storage
  • Conversion of existing sludge dewatering beds into a covered, dewatered sludge reservoir
  • Renovation of suction sewage receiving equipment, Renovation of leachate pump shaft and engine room, Conversion of post-sedimentation basin to sludge compaction basin function
  • Demolition of old technology (oxidation ditches, treatment building)
  • Design of courtyard space
  • Performing technological and control engineering installation

Conducting the test run