Start: | November 2017 |
Completion deadline: | 30/07/2019 |
Type of work: | Construction of sewers and wastewater treatment plant |
The purpose of the project is to collect the wastewater generated in the town and to treat it at the wastewater treatment plant.
At present, the town of Méhkerék has no sewers or wastewater treatment plant, wastewater is partly desiccated and partly removed in pump trucks.
Tasks to be performed during the construction of Méhkerék’s sewage system:
Number of properties to be connected: 887
Backbone sewer (D 200 KG PVC, enamelled ceramic pipes): 16.5 km
Pressure pipes: 3.3 km
Lifting pumps: 4 units
The Client requires a new wastewater treatment plant with 2083 LE of biological treatment capacity.