CONSTRUCTION OF NEW TRAM STOP ALONG BÉKE ROAD

Start: 03/05/2017
Completion deadline: 02/01/2018
Type of work: Construction of new tram stop

 

The objective was the establishment of an intermodal link between Angyalföld Railway Station and Tram Line 14.

The task consisted of the construction of 2 new accessible side platforms, partial reconstruction of the overhead line network with replacement of some overhead line support poles, construction of roofs over the platforms, reconstruction of road surface, with two new bus stops.

The frame object under the road had to be reconstructed to make room for the platforms and bus bays. Implementation also required shotcrete securing of soil on slopes.

During the project, a new junction with traffic lights was built, and all the public utilities installed under the pavements had to be relocated as well.