Start: | 18/05/2016 |
Completion deadline: | 18/10/2017 |
Type of work: | Bridge reconstruction |
The following renovation work is to be completed:
- Full replacement of the flyover’s asphalt pavement
- Reconstruction of abutment walls and curbs, slope surfaces
- Complete insulation of the flyover
- Renovation of dewatering system, bridge railings and the railway’s protective nets
- Reconstruction of existing dilatation structures and construction of new ones
- Renovation of the public lighting
- Internal renovation of bridge abutments, hygienic painting, replacement of external doors, covering of floor gullies