Start date | 30/09/2013 |
Type of work | Water construction |
Description of the work
During the project, the obsolete water conduits operating in the individual villages were replaced. A total of 5681 m of new, reconstruction water pipeline sections were built of HDPE material, size D 110–D 160. In parallel with the reconstruction, along the water pipeline sections, the obsolete connection pipelines were also replaced. Some obsolete town water towers were also renovated during the project.
- Borsodivánka: 50 m 3 water tower renovation
- Egerlövő: 50 m 3 water tower renovation
- Négyes: 50 m 3 water tower renovation
- Tiszavalk: 50 m 3 water tower renovation
- Tiszabábolna: 150 m 3 water tower renovation
- Cserépváralja: 30 m 3 steel water reservoir renovation