Start: | 18 September 2017 |
Completion deadline: | 13 September 2018 |
Type of work: | post-stressing work on reinforced concrete structures |
Inclusion of protective pipes in the rebar, installation of anchor points, installation of steel post-stressing strands, tensioning of cables consisting of 9 strands, injection of cable spaces.