PERFORMANCE OF WASTEWATER TREATMENT PLANT AND SEWAGE NETWORK DEVELOPMENT TASKS IN HEVES

Start: 01/12/2017
Completion deadline: 30/11/2020

Construction of a new, modern wastewater treatment plant with 10812 LE, Q=1400 m 3/h capacity to replace the old, obsolete treatment plant. The technology is being constructed alongside the old plant, so that during construction, the old technology can still be used for treating incoming wastewater.

Main work processes of the construction project:

Wastewater plant:

– Excavation

– Structural construction

– Installation of mechanical machinery

– Electric and control technology work

– Trial operation

Reconstruction:

– Electric and mechanical refurbishment of existing lifting pumps

– Reconstruction of the existing pressured sewage network into a gravity drain system