MODERNISATION OF THE KELENFÖLD-SZÁZHALOMBATTA RAILWAY LINE AND ASSOCIATED FACILITIES

Start: 16 December 2016
Completion deadline: 30 June 2020
Type of work: railway construction

The job was awarded to the “Siding 2016 Syndicate” composed of V-Híd Zrt. and A-Híd Zrt.

Title of the project: “Modernisation of the Kelenföld (excl.) – Százhalombatta (excl.) railway section and associated facilities”, consisting of the renovation of Railway Line no. 40 between the 18+000 to 219+000 hm sections.

 

  • Construction of heated points in three stations, in a total of 50 groups of points
  • Reconstruction of 25 kV, 50 Hz alternating current overhead line system: 56 km
  • Pole transformers
  • Installation of overhead line energy remote control (OLERC) and local remote control (LRC) railway systems
  • Installation/reconstruction of outdoor lighting in the P+R car parks and their access roads
  • Renovation or reconstruction of bridges, frame bridges and culverts: 27 items
  • Construction of new pedestrian and platform underpasses: 5 items
  • Construction of railway substructure at Háros Station and along the Érd (excl.) – Százhalombatta (excl.) section, 200+00 to 2019+00 hm section.

• Construction of cable substructure at Háros Station