Drinking water quality improvement project for the town of Borsodivánka and other towns

 

Start date 30/09/2013
Type of work Water construction

 

Description of the work

During the project, the obsolete water conduits operating in the individual villages were replaced. A total of 5681 m of new, reconstruction water pipeline sections were built of HDPE material, size D 110–D 160. In parallel with the reconstruction, along the water pipeline sections, the obsolete connection pipelines were also replaced. Some obsolete town water towers were also renovated during the project.

  • Borsodivánka: 50 m 3 water tower renovation
  • Egerlövő: 50 m 3 water tower renovation
  • Négyes: 50 m 3 water tower renovation
  • Tiszavalk: 50 m 3 water tower renovation
  • Tiszabábolna: 150 m 3 water tower renovation
  • Cserépváralja: 30 m 3 steel water reservoir renovation